UK Parliament / Open data

High Speed Rail (West Midlands-Crewe) Bill

My Lords, I thank the noble Lord, Lord Adonis, for tabling

the amendment and all noble Lords who have taken part in this first debate in Committee on the HS2 phase 2a Bill. Before I go any further, on behalf of the Government, I extend my sincere thanks to the Select Committee. I am particularly grateful that its members agreed to undertake hearings for petitioners virtually. That was the first time this had been done and the noble and learned Lord, Lord Hope of Craighead, and the other committee members did an incredible job in the most challenging of circumstances. Where petitioners chose to appear in person, the committee undertook hearings in a hybrid fashion and handled all the different ways of working with ease. I therefore put on record my thanks, and those of the Secretary of State and the Government as a whole, for its work and ensuring that we maintained momentum on this incredibly important Bill.

Turning, then, to the debate on this first amendment, I note that many noble Lords know what I will say. I hope I will not disappoint and that I will get my words right. The noble Lord, Lord Adonis, is a great and very knowledgeable advocate for HS2 and I thank him for his continuing support for and dedication to getting the railway built, and for setting out so passionately his reasoning. Despite my appreciation for the noble Lord’s tenacity, I do not see that the amendment is needed. I also feel that potentially, it is very unhelpful.

There is simply no benefit or technical justification for making the progress of work on this section of railway—a very short one of just 36 miles, going from the West Midlands to Crewe, also known as phase 2a —contingent on the deposit of a Bill for the eastern leg of phase 2b. While the Bill is part of a much bigger project, as noted by the noble Lord, Lord Liddle, the amendment would delay works on phase 2a by a significant period, given the scale and complexity of hybrid Bills and the time needed for their preparation.

All being well, if we can get this Bill through your Lordships’ House, we expect work to commence in the early part of next year. It will not surprise noble Lords to hear that there is a window in the early part of next year in which the work needs to start; much of it is environmental work that is sometimes limited by the time of year in which it can take place. We do not want anything to delay the passage of the Bill and, therefore, the start of the works for phase 2a. Secondly, those works are intrinsically linked to work going on in phase 1. As the noble Baroness, Lady Randerson, noted, continuity is really important. The two works will eventually proceed alongside one another. Therefore, it would be better to get the Bill through.

We have come a long way in the last 12 months or so since Second Reading. We had the Oakervee review, in which Douglas Oakervee said that the whole of HS2 should go ahead, but that the Bills for phase 2b —there will be Bills, not a single Bill—should not be introduced to Parliament before the publication of the integrated rail plan, which, as noble Lords will have heard me say before, is due to be published by the end of the year. Delaying the beginning of works on phase 2a until an eastern leg Bill has been deposited in Parliament would serve only to delay the phase 2a works and the benefits of HS2 reaching the north and the Midlands.

3.30 pm

When this section of phase 2a was brought forward ahead of the rest of phase 2 of HS2 back in 2015, the idea was to accelerate the benefits that this 36-mile section secures. Events since that acceleration announcement in November 2015 have conspired to delay this Bill, which is why it is so important that we maintain momentum now. Nevertheless, I reassure all noble Lords that plans to provide the benefits of high-speed rail to the east Midlands, Yorkshire and beyond will be confirmed following the publication of the integrated rail plan. Both the Prime Minister and the Transport Secretary have been clear that it is not a case of “2b or not 2b”, and that a properly connected line from the Midlands up to the north will be a key part of the HS2 project.

As the Prime Minister recently confirmed, there will be a doubling down on the strategy to level up across the country. Delivering HS2 is a major part of it and the integrated rail plan, which looks specifically at connectivity, is a major part of getting it right. While I empathise with the noble Lord, Lord Adonis, and other noble Lords in wanting to have a debate about the broader aspects of the HS2 project, that is not for now. It is not for Committee on the phase 2a Bill, but I will write if there is further information on some of the points raised by noble Lords.

I want to see works on this section of the railway under way as soon as possible. I am sure that the noble Lord, Lord Adonis, wants to see that too and, on the basis of this reassurance, I trust he feels able to withdraw his amendment.

About this proceeding contribution

Reference

807 cc349-351GC 

Session

2019-21

Chamber / Committee

House of Lords Grand Committee
Back to top