High Speed Rail (West Midlands–Crewe) Bill

My Lords, I start by saying that I agree with pretty well everything that everybody—except for one noble Lord—has said so far; I will try not to repeat those things. I say gently before beginning that I have looked in the Companion and I cannot find anything at all about the ability of the Government to impose arbitrary time limits on speeches beyond the normal time limits for Second Reading debates. If we are to do this in future, it is something that should be discussed.

It is nearly 10 years since all this started, and where are we? I am tempted to say that we have got as far as digging up cemeteries. I accept what the noble Lord, Lord Adonis, said that there is rather more work than that going on, but it is taking an inordinate amount of time. The proposed route for phase 2a, which we are discussing today, was first published four years ago. I compare this not with China—as a place where things can be done without asking people what they think—but with France. I go to the Pyrenees most summers and I watched the construction of the line from Tours to Bordeaux, extending the existing TGV line, which seemed to be done in a small number of years. I have travelled on it twice in the last two years; I have to say that not only does the line seem okay but so does the new TGV, which I travelled on, there and back, two or three weeks ago.

Last Friday, going home I travelled on one of the new Azuma trains from Kings Cross to Leeds. In comparison—from the point of view of the ride, the acoustics and, of course, the infamous seats—I felt that I had gone back 40 years. Then I reminded myself that the Azumas were ordered and specified by the Government themselves, which I think says something.

All we get are reviews and promises of delays. I am reminded that the Victorians effectively built the mainline network in England in less than a quarter of a century. We seem to take a very long time indeed to do these

things. A lot of the opposition to HS2 is about the competence, efficiency and effectiveness of the people doing it: the Government, HS2 Ltd and everybody else. We must distinguish between the need for the line—the project itself—and the need to improve the way these things are done. People attacking the way that it is being done—alleged efficiency, overspends or whatever—is not an argument against building the line; it is an argument to say that we need to do things better in this country.

The proposal that we are talking about today—extending to Crewe—is a relatively small part of what I hope will, in the future, become a substantial network connecting the main regional centres of the country. We need to start thinking about it in those terms. It is not a question of a line from Birmingham, Manchester or Leeds to London, with all this London-centric thinking. We should be thinking about a network that connects all the major cities in the area.

As far as extending it to Crewe is concerned, it would be a very good thing for people in Lancashire and the north-west, as well as, I would hope, people in Scotland. It would allow trains from the new HS2 line to run further north, just like the train I caught to Lourdes the other day—I have to say I was going there for the mountains and not for other purposes. That train slowed down after Bordeaux and became a normal fast express. Then, when it got past Dax, it slowed down a lot. The advantage is that people can do a lot of the journey at high speed and then continue to other places. When the new line to Crewe opens, as I hope it will, it should be the basis of Scottish services as well, not just services to the north-west.