UK Parliament / Open data

High Speed Rail (West Midlands–Crewe) Bill

I was going to go on to ask when progress is expected on the route across the Pennines. Do the Government constrain the activities of Transport for the North compared with the improvements made between Edinburgh and Glasgow and the plans of Midlands Connect by, for example, withholding funding from Transport for the North? The north of England should be very concerned about the slow rate of progress.

Much is made of disruption because of the noise and disturbance caused by building HS2, but measures will be introduced to minimise that. I am reminded of a conversation I had a couple of years ago with a Labour MP from Kent. I asked him whether his constituents had complained about the noise and impact of HS1. He replied, “No, but I had sackfuls of correspondence from them about the continuing noise and disturbance coming from the adjacent M20 motorway”. There is a light at the end of the tunnel for those living close to HS2. The benefits of and the green agenda for more motorway building are now seen as a totally incorrect response to the problems we face. The debate is about capacity for passengers and freight—there is no spare capacity on the railway. We want cleaner air, fewer people flying and less congestion, and to that end our railways need to be expanded.

However, this Government lack foresight. What Administration would build the east-west link from Oxford to Cambridge without electrifying it? It costs far less than coming back after the line is open. They should seek to modernise links between Southampton and the north and between Felixstowe and Nuneaton. Both schemes would remove many heavy lorries from our roads, much to the benefit of our climate change agenda.

Freight customers are lining up to use the railway. Creating an electrified rail network would reduce serious accidents. HS2 could and should reduce its costs by looking at what some regard as excessive technical standards and probably reduce the speed of operation. The extension from Old Oak Common to Euston should also be called into question. For the future, we need better and more capacity, and to that end HS2 should proceed.

4.30 pm

About this proceeding contribution

Reference

799 c1311 

Session

2017-19

Chamber / Committee

House of Lords chamber
Back to top