I am very grateful for that statement. My hon. Friend makes an important point. A concern that dates back even to those times is that many of those who have been in charge of procurement have not stayed in their posts for long. Indeed, the people in uniform who filled those posts would spend six to 18 months on a project and, once they were conversant with it, would be rotated out and back to a front-line posting or elsewhere, and all that knowledge would be lost. The mistakes were made because the knowledge was not passed on correctly.

I want to look at some of the big issues that have been mentioned in this debate. The Queen Elizabeth class carriers project, which started in 1998, was deliberately delayed by the last Government at a cost of more than £1 billion. The cost of the Nimrod spiralled out of control. Nine aircraft cost as much as three space shuttles. That was outrageous spending. When we came into government, we decided to stop that process, because not one of the aircraft was able to get an airworthiness certificate and get into the sky.

The Typhoon has also been mentioned many times: an example of procuring for the last war rather than looking ahead. It is a cold war fighter plane that is unable to hit anything on the ground. Not only does it have no ground attack capability—[Interruption.] If the hon. Member for Plymouth, Moor View (Alison Seabeck) wants to intervene I will happily give way; if not, I ask her please to listen to what I am saying.

About this proceeding contribution

Reference

566 c1007 

Session

2013-14

Chamber / Committee

House of Commons chamber
Back to top