My noble friend is absolutely right: these will come out as we go through the consultation and further design stages.
Government Amendment 93 is consequential on legislation which is already on the statute book; namely, the Judicial Review and Courts Act 2022. It brings the enforcement provisions relating to the community infrastructure levy in line with the enforcement provisions relating to the new levy, which in turn reflect the provisions in the 2022 Act, creating a consistent, coherent cross-government policy on sentencing law.
We believe that we have a strong case for proceeding with the new infrastructure levy and have built in safeguards to ensure that development can progress with vital mitigations in place. We recognise that introducing the infrastructure levy is a significant change to the existing system. That is why we propose to introduce the levy via a test and learn approach. If the levy is found to have negative impacts in the context of one particular local authority, the Secretary of State will have the flexibility to disapply the levy in that authority for a specified time period.
In any system of developer contributions there are trade-offs between seeking simplicity and at the same time enabling individual site circumstances to be catered for. These are tricky balances to strike, and if our initial policy design leans too far in one direction or another, it may impact on the pace at which development can come forward. It is likely that revisions will be required of the initial levy regulations, as occurred with the community infrastructure levy, as the system beds in. While we do not expect these to be substantial, it will give local authorities confidence that the system will be flexible and able to be adjusted to experience on the ground. We do not expect the power to disapply the levy to be used often—if at all. However, it is a sensible, inbuilt precautionary power to cater for all circumstances.
5.30 pm