UK Parliament / Open data

Heavy Commercial Vehicles in Kent (No. 2) (Amendment) (No. 2) Order 2021

My Lords, I take this opportunity to say how nice it is to see the noble Lord, Lord Bradshaw, back in action again. As usual, he made some interesting and relevant comments, even though he often sought to say that they were not strictly relevant to the order. Indeed, some of my questions are geared to the extent to which we need this order, though we certainly do not oppose it.

I think I have understood the reason why we are here today. I thank the Minister for her explanation. If I have understood it correctly, this order corrects an error in a previous order, since the words in the order we are now discussing between “means all” and “other than” at the top of page 2 were left out from the definition of,

“the relevant class of road.”

That meant that the police did not have the powers to impose a fine of, I think, £300 on drivers who were not using the roads specified in the order. When Operation Brock is in force, the 2019 order restricts cross-channel

heavy commercial vehicles from using local roads in Kent, apart from those on the approved Operation Brock routes.

How often have the provisions of the order had to be brought into effect since it was first put in place, because of bad weather and industrial action causing serious delays at the cross-channel ports? I think these were the two specific instances which the Government previously gave to justify the order. I say that bearing in mind that the Operation Brock arrangements—which replaced Operation Stack—are now permanent rather than temporary. If the answer is that the provisions of the order have never, or very rarely, been used, do the Government expect the Operation Brock arrangements to be brought into operation more or less frequently in future? For what reasons might this happen—over and above bad weather and industrial action, to which the Government have previously made reference?

If these arrangements have never been brought into operation, how close have we ever been to that happening? Do the Government think it would ever be necessary to bring the Operation Brock arrangements into effect because of disruption at the ports, following a breakdown in our new trading arrangements with the EU, or could such a breakdown never result in a level of disruption that would reach the threshold for bringing the Operation Brock arrangements into effect?

What is the definition of “serious delays or disruption” at the cross-channel ports that might lead to the Operation Brock arrangements being brought into effect, and who makes the decision on whether the serious delay or disruption threshold has been reached? For example, have the arrangements had to be brought into operation recently because of any blockading of French ports by fishing vessels?

Finally, is there a cost to making the Operation Brock arrangements permanent? If so, what is that cost, including how much per day and per week on each occasion that the Operation Brock arrangements are brought into effect? How much does it cost per day and per week to have the Operation Brock arrangements on standby, ready to be brought into effect as and when required?

I do not think the Minister will be wondering why I am asking these questions, but they are similar to those raised by the noble Lord, Lord Bradshaw. How often, frankly, will these provisions be needed? Are we justified in having them on a permanent basis? I am sure she will respond on that issue.

About this proceeding contribution

Reference

816 cc386-7GC 

Session

2021-22

Chamber / Committee

House of Lords Grand Committee
Back to top