UK Parliament / Open data

Housing and Planning Bill

The noble Baroness has raised something that I have said I will take away. I will also take away the noble Lord’s point because it is not particularly provided for in the Bill. Will the noble Lord and the noble Baroness let me take that away and reflect on it?

On Amendment 96ZA, an important starting point is that permission in principle will be granted where a proposal accords with the development plan for the area, having regard to the National Planning Policy Framework, as I have said, alongside other material considerations. When choosing appropriate sites that may be deemed suitable for a grant of permission in principle through a local plan, local authorities will be able to draw on a wealth of information to determine whether that site is suitable. That includes information gathered to support their local plan, a strategic housing land availability assessment, local knowledge of areas of constraint, engagement with communities and statutory bodies, and other information. That will all be underpinned by consideration against local and national policy.

It is possible that on the basis of that assessment a local authority could conclude that granting permission in principle would not be appropriate, either because the site is unsuitable—which goes to the point made by the noble Lord, Lord Greaves—or, in exceptional cases, that the fine detail of the scheme needs to be worked up before a decision can even be reached on the principle of development. I hope that what I have set out is a sensible basis for deciding whether to grant permission in principle. I remind noble Lords that it must be followed by a grant of technical details consent before development may commence.

I turn to Amendments 96ZC, 96ZD, 96ZE, and 96ZF, which provide by condition for the assessment of flood risk, highways and access, contaminated land, and securing of appropriate infrastructure through either Section 106 contributions or the community infrastructure levy. I hope that I have put the noble Lord’s mind at ease over the course of my remarks as I have described in more detail how permission in principle will operate—specifically that it will still include consideration of these important matters through an assessment against local and national planning policy.

Specifically on conditions, I hope that my comments on Amendment 94ZC set out the Government’s thinking on the timing for the use of conditions. Permission in principle is to provide simple certainty on the basic acceptability of a site early on in the process. As it

does not on its own authorise development, conditions at this point would unnecessarily complicate matters, although we would expect local authorities to make clear, when they give permission in principle, the matters that they would expect to see covered in an application for technical details. On the community infrastructure levy, I confirm that, where it is in place, it would become payable once technical details consent has been granted, as is the case when full planning permission is given.

Finally, Schedule 12 is a list of consequential amendments that we have made to the Town and Country Planning Act and other planning legislation. This accompanies Clause 136 and is important for ensuring that permission in principle, as a new route to obtaining planning permission, operates effectively alongside the existing system. I will therefore press that Schedule 12 stands part of the Bill.

8 pm

About this proceeding contribution

Reference

769 cc2303-4 

Session

2015-16

Chamber / Committee

House of Lords chamber
Back to top