UK Parliament / Open data

High Speed Rail (West Midlands - Crewe) Bill

As an enthusiastic supporter of improvements to our rail network, I welcome the principle behind the Bill—establishing a high-speed railway beyond Birmingham—but I have some concerns, so I welcome this opportunity to set out how I think the Bill could be improved, particularly for the ambitious and growing city of Stoke-on-Trent.

My right hon. Friend the Secretary of State, as a recent and welcome visitor to my constituency, will know exactly how ambitious we are. The scale of the local rail improvements we are seeking and planning for are, like HS2 itself, unmatched since the Victorian era. We are keen to embrace the many opportunities arising from HS2. HS2 is going to happen—that is no longer the debate; phase 1 preparations are already under way, and the actual building of phase 1 begins next year. Time is marching on. The section we are debating in the Bill, phase 2a, is due to open to passengers by 2027—the end of the next Parliament. We must get on with the Bill, or it will not be long before we are living with the consequences of getting it wrong.

The principle of a high-speed railway line from the west midlands conurbation to Crewe is sound—releasing capacity for passengers and freight services on the existing network, while cutting the fast times to Crewe from London to under an hour—and in principle I welcome it, but for the social and economic benefits of HS2 to be maximised in practice, there needs to be much better integration, as many hon. Members have mentioned. Improvements to infrastructure on the existing network around Stoke-on-Trent, as well as local rail improvements for connecting trains from Crewe, including the Crewe to Derby line, which serves Longton in my constituency, are vital.

The Secretary of State joined me on that service earlier this month and has seen at first hand the improvements needed on it. I welcome the much-needed investment in our local transport infrastructure that he proposed when he visited, but there is much left to be resolved around how the benefits of HS2 will be delivered in and for Stoke-on-Trent. As the briefing note that the public affairs department of HS2 Ltd kindly sent to MPs for this debate puts it:

“Detailed work and consultation is currently being undertaken on options for the development of the HS2 Crewe Hub, with the potential for a HS2 service at Stoke.”

That is a tantalising, and potentially a very lucrative, assurance for the city.

There is clearly a need for Stoke-on-Trent to be connected—it is fundamental to HS2 being of maximum benefit to my constituency. We are told by HS2 Ltd that the Bill “could” mean better commuter services and the potential for extra freight trains, and we are assured by the Rail Delivery Group that it “will” add much-needed space for more and faster trains. I say that it “must” deliver these benefits. To do that, the Government need to be clear that a viable option for the Stoke connector, as promoted by Stoke-on-Trent City Council, is firmly on the table, to ensure that the infrastructure around Stoke-on-Trent receives the vital upgrades it needs.

This would mean getting, in addition to the proposed Handsacre link, which is appropriate for Stafford, a low-impact five-mile line designed to take classic compatible HS2 trains from the main HS2 line through the very significant Stoke-on-Trent catchment and on to the rest of east Cheshire, Macclesfield and Stockport. Such a dedicated Stoke connector would provide the necessary link to improve connectivity and boost capacity. It would do so by getting around the bottleneck that will otherwise remain on the west coast main line to the south of Stoke-on-Trent. That is the way to maximise the full opportunities for more housing and jobs, and I will continue to pursue this matter as the Bill progresses.

It is also imperative that Stoke-on-Trent continue to enjoy regular fast train services to and from London—at least one service every half hour or more frequently. HS2 compatibility should offer my constituents improved journey times as well as helping us to maximise both housing and commercial development in the city, fully seizing the economic opportunities that Stoke-on-Trent offers.

It is essential to address the lack of fast, direct services between Stoke-on-Trent and Birmingham, to match the good quality of the services currently offered between Stoke-on-Trent and Manchester. Through the Bill, HS2 has the potential to address the severe overcrowding and poor connectivity that are currently experienced between Stoke-on-Trent and Birmingham. There is also the potential to improve connectivity further by providing the direct intercity services that are currently lacking between locations such as Stoke-on-Trent and Liverpool. That would fully exploit the potential for economic growth from the midlands engine and northern powerhouse initiatives, with Stoke-on-Trent as the gateway to the north.

As well as improving services, it is essential to do more to improve both the capacity and the offer at Stoke-on-Trent railway station. Although it is the main station serving the potteries conurbation, which consists of more than half a million people, it currently has limited platform and concourse capacity, as well as poor-quality retail facilities. Again, Stoke-on-Trent City Council has stepped forward with detailed proposals. The Stoke-on-Trent HS2 master plan sets out the ambition to transform the station, vastly improving capacity and facilities, and leveraging significant redevelopment in the wider area on the back of those improvements. It is important for those proposals to be realised if we are to ensure that the station is HS2-ready and playing a full part in the city’s regeneration.

I fully support the principle of the Bill, and it will receive my support tonight. I am a positive and enthusiastic supporter of improvements in our rail industry, and I am keen for us to finally emerge from the legacy of the

disastrous erosion of Stoke-on-Trent’s rail network that we saw under nationalisation. I know that the Secretary of State is equally committed to large-scale improvements, and I thank him for the commitment to invest in our local transport infrastructure that he gave during his recent visit to my constituency; it was hugely welcome. However, I take very seriously the need to improve infrastructure interconnectivity, and further work needs to be done on that. I also take very seriously the opportunities promised by the Department for Transport and HS2 Ltd, which have said that detailed proposals will continue to be refined for HS2 as the Bill progresses. I look forward to playing my part in that process to the full.

5.57 pm

About this proceeding contribution

Reference

635 cc767-9 

Session

2017-19

Chamber / Committee

House of Commons chamber
Back to top