I absolutely agree, but unfortunately that advice has not been taken.

Secondly, I have no confidence whatever in the Government’s stated outcomes for HS2 phase 2 in building costs or in social and environmental impacts. This comes from the dismal experience of their failures over their own reports on phase 1. The House of Lords Economic Affairs Committee cast doubt on phase 1 from the beginning of the process, arguing that the evidence used to calculate the magnitude of benefit was out of date and unconvincing. The Library briefing shows how the benefit to cost ratio of phase 1 has fallen consistently over time. Nothing has been done to address these flaws in the economic modelling.

Progress on the delivery of phase 1 is similarly criticised by the National Audit Office in its 2016 review, which stated that the Department for Transport had

“set HS2 Ltd a schedule for achieving delivery readiness that was too ambitious”,

and that:

“There is a risk that the combined impact of cost and schedule pressures result in reduced programme scope and lower the benefit cost ratio.”

It also stated that:

“Effective integration of High Speed 2 with the wider UK rail system is challenging and poses risks to value for money”.

The NAO attacks the cost estimates for phase 2, which it says are

“at a much earlier stage of development than phase 1”,

with some elements currently unfunded. For the past four years, the Infrastructure and Projects Authority has put HS2 just one step above appearing what it defines as

“unachievable unless significant, urgent and often substantial action is taken.”

I ask the Minister what evidence there is that this will be done.

Cost overruns and delays have long been associated with public construction, but HS2 dwarfs the problems of the past. Think about the amount that could be made available to the public services if these billions and billions of pounds went towards something other than this white elephant in the making. We are doomed to exist in a perpetual cycle of departmental over-promising and under-delivering. In the light of concerns about the phase 1 Bill, it is impossible to trust the Government’s assertions as to the benefits of phase 2.

Thirdly, I must cast doubt over the ability of HS2 Ltd. The Public Accounts Committee accuses HS2 Ltd of having a culture

“of failing to provide full and accurate information to those responsible for holding it to account”

and states that it

“does not have in place the basic controls needed to protect public money.”

There cannot be a bigger condemnation than that. Those basic failures underline the incompetence with which the project has been conducted. Most damningly, the PAC accuses both HS2 Ltd and the Department of not appearing

“to understand the risks to the successful delivery of the programme”.

This is a Second Reading debate, and I am saying that all the reports indicate that we can have no trust in how the principal objectives of the project are being conducted. That is evident in the employment of Carillion as a key contractor on the project. A clear lack of oversight and due diligence has jeopardised public money. Those arguments mean that the Bill fails to meet the standards required of this House.

Moving to the local issues that affect my constituents, I am thoroughly dismayed with the entire project. Not only does the proposal carve through my entire constituency from top to bottom, without any immediate benefit to my constituents in terms of communication or railway stops, but many will acknowledge that the current west coast main line provides a good service and short journey times. As my right hon. Friend the Member for Chesham and Amersham has indicated, this HS2 project will be overtaken by new technologies, such as the possibility of a maglev system or a hyperloop system, and the technology used in the HS2 project is increasingly out of date. Within the timespan for the completion of the project, the money would be better spent on other programmes and public services.