I rise to speak to amendments 148 and 150 in my name, and to amendment 179 in the names of my right hon. and hon. Friends.

Under the large combustion plant directive, 8 GW of old coal has to close by 2015. Of that, 6 GW has already gone, with the remaining 2 GW being considered for conversion to biomass. That leaves 20 GW of old coal set to stay on the system. Of that, approximately 15 GW is being considered for all options, which means that it could be opted into the integrated emissions directive, investing in air filters for NOx and SOx in order to comply. This plant would then not have to close in 2023, and would naturally seek to maximise its return on that capital cost by continuing to provide base load generation capacity unconstrained by the EPS.

Amendment 148 would ensure that where substantial pollution abatement equipment properly dealing with the oxides of sulphur, nitrogen, heavy metals or particles is fitted to the generating station in such a way that

makes it compliant with the EU IED while still emitting above 450 grams per kWh, the plant would then be brought under the EPS framework. Without the amendment, many plants will succeed in circumventing the EPS, which would undermine the EMR, the UK’s carbon budgets, the incentive to invest in CCS and the coalition agreement, which committed the Department of Energy and Climate Change to introducing an EPS as a backstop to unabated coal. Remember, these old coal plants have already recouped their capital costs. Allowing them to avoid the EPS cannot therefore be justified, and I dispute what the Minister said about the importance of not accepting the amendment in order to allow new coal to recoup its costs.